Overview

Timetable

What happens when? This timetable shows the planned milestones and their timing at a glance.

3D Seismic Contracting & Permitting

The 3D seismic survey and the associated permitting process have been commissioned.

Seismic measurements

Planning for the seismic work has begun. Active measurements are scheduled to begin in October.

Analysis of the geological data

Once the measurements have been taken, the data collected is analysed and suitable locations are sought.

Site selection, detailed planning, preparation and approval of the main operational plan

This requires various expert reports, which are incorporated into the drafting of the main operational plan.
Applications can also be made for grants (e.g. from BAFA).

Tendering and awarding of the drilling contract

Once the main operating plan has been approved, work can begin on constructing the drilling site and commencing drilling operations.

Drilling site construction & commencement of drilling

Once these have been identified, a heating plant will then be built to connect the geothermal energy to the district heating network.