3D Seismic Contracting & Permitting
The 3D seismic survey and the associated permitting process have been commissioned.
Seismic measurements
Planning for the seismic work has begun. Active measurements are scheduled to begin in October.
Analysis of the geological data
Once the measurements have been taken, the data collected is analysed and suitable locations are sought.
Site selection, detailed planning, preparation and approval of the main operational plan
This requires various expert reports, which are incorporated into the drafting of the main operational plan.
Applications can also be made for grants (e.g. from BAFA).
Tendering and awarding of the drilling contract
Once the main operating plan has been approved, work can begin on constructing the drilling site and commencing drilling operations.
Drilling site construction & commencement of drilling
Once these have been identified, a heating plant will then be built to connect the geothermal energy to the district heating network.